The Badra oil field, situated in Eastern Iraq, needed to optimize power augmentation of the Gas Turbines in order to comply with highly demands Oil & Gas Standards. ARANER proposed for this project the TESTIAC system to increase power and efficiency of the plant, facing the challenge of achieving greater energy without water consumption, due to the restrictions because of the availability of water in the region.
Download this ebook to know how these objectives were achieved:
ARANER took part in this project facing the challenge of improving energy production during high ambient temperatures. Badra not only got this goals, but all of these others too. Find out how!
Download our case study