Thanks to ARANER solutions,

The Badra oil field achieved:

  • Energy Storage Tank installation.
  • Low maintenance cost.
  • Increasing of power output.

Reference of power and efficiency augmentation

ARANER took part in this project facing the challenge of improving energy production during high ambient temperatures. Badra not only got this goals, but all of these others too. Find out how!

Download our case study